XMY machinery, We located in zhangjiagang city jiangsu province, it is near to shanghai airport
Our advantage:
1.Stable machinery quality
2.Professional engineer team
3.Good after service
(we will reply customers within 1 hour once the machine got any problems and give the solution within 24 hours )
Water Lines. --- XMY One partner for all your needs.
We provide:
1. Water treatment system;
2.Bottle blowing machine;
3.Washing filling capping machine;
4.Cap elevator and online sterilizing system;
5.Air blow dryer;
6.Labeling machine ( sticker label/ sleeve shrink label/OPP glue label)
7.Packaging machine (White film/colour film/carton case)
8.Palletizer
Success in water beverage production requires focus on maximum output and efficiency, with commitment to hygiene, food safety and cost optimisation. Whether you're producing still or sparkling water, our unmatched expertise helps you achieve more with extensive technical knowledge and packaging capabilities.
Our machine advantage
1. Latest structure with automatic lubricating system ,protect bearing, prevent bearing dry rotary due to lack of oil.
2. No need workers to guard the filling machine, save one labor.
3. High speed, energy efficiency, more stable .
Technical parameter : water bottling plant sale |
Model |
BFC8-32-10 |
BFC10-40-12 |
BFC12-50-15 |
BFC14-60-20 |
BFC18-90-25 |
BFC20-90-27 |
capacity (for 500ml) |
18000 |
20000 |
24000 |
30000 |
45000 |
48000 |
Suitable bottle shapes |
PET circular or square |
Bottle diameter(mm) |
Dia50-Dia105mm |
Bottle height (mm) |
160-320mm |
Compressor air |
0.3-0.7Mpa |
Washing meidium |
Aseptic water |
Rinsing pressure |
>0.06Mpa <0.2Mpa |
Application |
water bottle blowing washing filling capping |
Total power (KW) |
180kw |
180kw |
180kw |
200kw |
220kw |
250kw |
Overall dimensions |
11*3m |
11*3m |
11*3m |
12*3m |
12*3m |
13*3m |
Height |
2.6m |
2.6m |
2.6m |
2.6m |
2.6m |
2.6m |
Weight(kg) |
20000kg |
22000kg |
35000kg |
41000kg |
55000kg |
60000kg |
1.Pre-salve service
1). Provide professional suggestions, make proposal and best solution to customers.
2). Design the bottle /layout of machines according to customer's factory size.
3). Welcome to visit factory anytime.
2.After-sales service
1). Installation & debug service, training service. After machine arrive customer's factory, professional engineer(1-2 people) will go to customer's factory to install the machine,debug and provide training service until you can operate the machine well and could adjust the process and treat different failures. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
2). Quick response within 24 hours .
3). 1 years guarantee , enough spare parts,and life-long technical support.
4). All business information will be confidential to any third party.
Jiangsu Xinmeiyuan Machinery Co.,Ltd.
XMY machinery is a professional manufacturer of beverage filling and packing machine in China.Wide range products, Good quality,Reasonable price, Stylish designs and good service help us win customer's trust.
1 / Standardized workshop of total 5,000 square meters.
2 / The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water
pipeline,and pneumatic, electrical and mechnical stability.
3 / Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
Our Team
1 / Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
2 / The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers' requirements to save space.
Our product include:
Blowing filling capping monobloc machine, Small bottle water filling production line
Juice filling production line, Carbonated drink filling production line,
Water treatment system, Beverage blending system,
PET bottle blowing machine, Labeling machine, packing machine.
FAQ
Q1:Do you have any reference project?
A1:We have reference project in most countries, and you can visit their factories if we get the permission of the customer.
Q2:How can I install my machine when it arrives?
A2:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.
Q3 How long time for installation?
A3: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q4: How about the spare parts?
A4: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
Q5: What is your payment term?
A5: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.